HIEP PHUOC RESIDENTIAL AREA

Project overview

Located on the facade of Ton Duc Thang Street, in the dynamic development area of the center of Hiep Phuoc commune (Dong Nai province), Hiep Phuoc Residential Area covers an area of ​​21.53ha with the total investment capital of 1.307 billion. This project has totally 1,172 units, including villas, detached houses, condos and apartments (for commercial use and low-income buyers).

Thanks to the potential advantages as well as diversified amenities, Hiep Phuoc Residential Area brings not only a high-end living standard to the residents but also a sustainable profitability investment channel in the future.

Investor: DIC Corp

Product distribution unit: Kim Oanh Real Estate

Construction Scale: 21.52 ha

Location: Hiep Phuoc Commune, Nhon Trach District, Dong Nai Province.

Total investment capital: 1.307 billion

Location

The project is located in Nhon Trach district - the center of the southern dynamic key economic region.

Located at the eastern gateway of Ho Chi Minh City, Nhon Trach has an extremely advantageous position which is the center of the economic development triangle of Ho Chi Minh City - Dong Nai - Ba Ria Vung Tau - the region with the fastest economic development rate in the country with modern inter-regional connected transportation system including roads, waterways, railways and airways. Also, the project with the location of the transshipment point between Long Thanh International Airport and Ho Chi Minh City Center, will make Nhon Trach a “land of gold” for commercial and services exploitation in the future. That is not to mention the State has also planned to build high-speed railway station in District 9 (Ho Chi Minh City) and floating markets on Dong Nai River, which are the locations directly linked with Nhon Trach.

On the other hand, the driving force of Nhon Trach is the strong development of industrial parks. At present, it has formed 9 industrial zones with a total area of ​​over 3,600 hectares with the occupancy rate of over 80%, attracting tens of thousands of laborers, businessmen and experts to work and live. This is the driving force for Nhon Trach that accelerates its urbanization rate, structural transformation towards prioritizes industry, trade and services. Thus, the property value will certainly increase dramatically.

  • Smoothly connect the traffic

Crossing through the key roads, Hiep Phuoc Urban Area has become the connecting point for dynamic economic zones such as Ho Chi Minh City, Nhon Trach City, Long Thanh Urban Area, Bien Hoa City, Phu My Port-Urban area.

The project location is also the focal point of a series of key traffic routes connecting from the East to the West, extending from Binh Phuoc, Binh Duong to Ho Chi Minh City, Dong Nai and Ba Ria - Vung Tau such as: National Highway No.51, Street No.319 (Tran Phu) connecting to Ho Chi Minh City - Long Thanh - Dau Giay Expressway, Ben Luc - Long Thanh Expressway which is expected to put in operation in mid-2018, My Phuoc - Tan Van roads which combine into a unified belt linking My Phuoc (Binh Duong) - Tan Van (Ho Chi Minh City) and Nhon Trach (Dong Nai).

In the near future, the North - South express railway, Thu Thiem railway - Long Thanh international airport, Bien Hoa - Vung Tau expressway, Cat Lai bridge connecting District 2 and District 9 with Nhon Trach city…

With the modern and synchronous transportation system, Hiep Phuoc Residential Area will be boosted to become a bustling city with a full range of high-end facilities in term of commercial, services and ecotourism.

Video

Progress

In 2016, DIC In 2016, the Hiep Phuoc residential area is under development by DIC Corp with the following details: completion of main roads, sidewalks, separators, manholes, rainwater and dirty water drainage sewers on streets No.7, 15, 18. Lighting system, medium voltage, low voltage and substation (T4, T5, T6, T7, T8) have been completed with the casting and erection of the post. Besides, the bidding package for upgrading the public-duty road of the project has completed the entire workload, checking and settling the final settlement. Intermediate medium voltage from provincial road 25B to T6 substation: The contractor has spread the wires from the connection point to the T6 substation. In addition, land preparation works for marker planting, mapping for Land Use Rights issuance and land allocation to clients. Funds for the project have been fully prepared.

DIC Corp has signed a contract with Kim Oanh Real Estate Joint Stock Company for exclusive distribution of project products. In August, the product was announced for sale and successfully transferred 574 lots of over 6ha land area with the total value of 249.7 billion.

In addition to the completion of legal procedures, in 2017, the main technical infrastructure of the project will be completely invested and implemented, including: Implementation of packages for ground leveling, water supply and green trees for the whole project; Construction of rain water and dirty water drainage for streets No. 7, 15, 16, 18 and routes B, C, D, F, H, K, L, M, N; constructing medium voltage, low voltage, lighting and T4, 5, 6, 7 and 8 power supply packages; Construction of 22KV medium voltage transmission line to T1, T2, T3, T9 substations; Construction and installation of equipment of T1, T2, T3, T9 substations; Constructing a temporary medium voltage (floating) package from 25B to T6; Construction of road, drainage and road drainage road package 9, road A.

Sales Policy

For further information, please contact:

 

Communication and External Relations – DIC Corp

Address: DIC Building - 265 Le Hong Phong Street, Ward 8, Vung Tau City

Phone: 0254 3859248 (Ext. 701)

Related Projects

Partner